42-481-32844
Final CompletionRADLEY CHILDREN TRUST
WHARTON County · District 3 · RADLEY CHILDREN TRUST · BLUE BASIN (MIOCENE SHALLOW)
Permits
1
Max Depth
1,700 ft
First Permit
1985-04-04
Latest Activity
1985-04-04
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-05-14
Shut-In
—
Plugged
2006-11-27
!
EWA / Permit operator mismatch
Scheduling: RADLEY CHILDREN TRUST ≠ Permit: TXO PRODUCTION CORP.
Resolved via: scheduling → RADLEY CHILDREN TRUST
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2006-11
Operator History
originally filed by TXO PRODUCTION CORP. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (2)
#271453 A TXO PRODUCTION CORP.
received 1985-05-21
#271453 A TXO PRODUCTION CORP.
received 1985-03-19
Well Details
- Well Number
- 8
- Max Depth
- 1,700 ft
- Drill Type
- Vertical
- County
- WHARTON
- District
- 3
- Operator
- RADLEY CHILDREN TRUST
- Completed
- 1985-05-14
Operator
- Location
- EL CAMPO
- P-5 Status
- Y (filed 2007-06-08)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- 239,077 mcf