42-481-32974
Final CompletionKOTLAR
WHARTON County · District 3 · HUGHES DAN A. COMPANY · EL CAMPO (KOTLAR 1ST. E.Y.)
Permits
2
Max Depth
12,000 ft
First Permit
1986-06-09
Latest Activity
1988-10-10
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1986-09-22
Shut-In
—
Plugged
2004-07-23
!
EWA / Production operator mismatch
Scheduling: HUGHES DAN A. COMPANY ≠ Production: TOMLINSON, THOMAS K. INC. (reported 1999-04)
Resolved via: scheduling → HUGHES DAN A. COMPANY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2004-08
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#352044 A HUGHES, DAN A. COMPANY
received 1988-10-07
#303027 A HUGHES TEXAS PETROLEUM, LTD.
received 1986-06-09
Well Details
- Well Number
- 1
- Max Depth
- 12,000 ft
- Drill Type
- Vertical
- County
- WHARTON
- District
- 3
- Operator
- HUGHES DAN A. COMPANY
- Completed
- 1986-09-22
Operator
- Name
- PLACID OIL CO
- Location
- BEEVILLE
- P-5 Status
- Y (filed 2010-11-05)
- Cum Oil (all leases)
- 3,387,488 bbl
- Cum Gas (all leases)
- 154,936,251 mcf
- Total Permits
- 448