42-481-33710

Final Completion

GROESBECK

WHARTON County · District 3 · CHAPARRAL ENERGY L.L.C. · FRIO (10560)

RRC Lookup

Permits

2

Max Depth

7,950 ft

First Permit

1994-05-25

Latest Activity

2010-08-09

Lifespan

16 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2011-02-04

Shut-In

Plugged

2011-06-08

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1994-07

Last Production

2011-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#699542 A CHAPARRAL ENERGY, L.L.C.
received 2010-07-23
#424261 A TALON DEVELOPMENT CO., INC.
received 1994-05-25

Well Details

Well Number
1
Max Depth
7,950 ft
Drill Type
Vertical
County
WHARTON
District
3
Completed
2011-02-04

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
15,903,956 bbl
Cum Gas (all leases)
91,595,701 mcf
Activities
G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
443

External Links

Live © 2026 Petrora