42-481-33796

Final Completion

NOHAVITZA J. E.

WHARTON County · District 3 · ADOBE ENERGY INC. · POPP (2600)

RRC Lookup

Permits

3

Max Depth

3,000 ft

First Permit

1995-06-23

Latest Activity

1997-12-12

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1995-08-11

Shut-In

Plugged

2006-02-22

!

EWA / Production operator mismatch

Scheduling: ADOBE ENERGY INC. ≠ Production: ENERGY 2000, INC. (reported 2004-04)

Resolved via: schedulingADOBE ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1995-08

Last Production

2006-02

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#471174 A ADOBE ENERGY, INC.
received 1997-12-12
#437218 A ADOBE ENERGY, INC.
received 1995-11-22
#437218 A ADOBE ENERGY, INC.
received 1995-06-23

Well Details

Well Number
2
Max Depth
3,000 ft
Drill Type
Vertical
County
WHARTON
District
3
Completed
1995-08-11

Operator

Location
THE WOODLAN, DS
P-5 Status
Y (filed 2004-09-03)
Cum Oil (all leases)
503,971 bbl
Cum Gas (all leases)
8,631,775 mcf
Total Permits
144

External Links

Live © 2026 Petrora