42-481-33878

Final Completion

HEYNE M. J.

WHARTON County · District 3 · TRANSTEXAS GAS CORPORATION · BONUS (FRIO 4500)

RRC Lookup

Permits

2

Max Depth

5,000 ft

First Permit

1996-05-24

Latest Activity

1996-05-24

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-08-09

Shut-In

Plugged

2000-08-16

!

EWA / Permit operator mismatch

Scheduling: TRANSTEXAS GAS CORPORATION ≠ Permit: ADOBE ENERGY, INC.

Resolved via: schedulingTRANSTEXAS GAS CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-08

Last Production

2000-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#448556 A ADOBE ENERGY, INC.
received 1996-08-21
#448556 A ADOBE ENERGY, INC.
received 1996-05-24

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
WHARTON
District
3
Completed
1996-08-09

Operator

Location
DALLAS
P-5 Status
Y (filed 2005-05-06)
Cum Oil (all leases)
8,537 bbl
Cum Gas (all leases)
974,078,417 mcf
Total Permits
925

External Links

Live © 2026 Petrora