42-481-33880

Final Completion

HEYNE M. J. A

WHARTON County · District 3 · TRANSTEXAS GAS CORPORATION · BONUS (FRIO 4500)

RRC Lookup

Permits

2

Max Depth

5,000 ft

First Permit

1996-05-30

Latest Activity

1996-05-30

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-08-09

Shut-In

Plugged

2000-08-21

!

EWA / Production operator mismatch

Scheduling: TRANSTEXAS GAS CORPORATION ≠ Production: ADOBE ENERGY, INC. (reported 1998-04)

!

EWA / Permit operator mismatch

Scheduling: TRANSTEXAS GAS CORPORATION ≠ Permit: ADOBE ENERGY, INC.

Resolved via: schedulingTRANSTEXAS GAS CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-08

Last Production

2000-08

Operator History

originally filed by ADOBE ENERGY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#448712 A ADOBE ENERGY, INC.
received 1996-08-21
#448712 A ADOBE ENERGY, INC.
received 1996-05-30

Well Details

Well Number
2
Max Depth
5,000 ft
Drill Type
Vertical
County
WHARTON
District
3
Completed
1996-08-09

Operator

Location
DALLAS
P-5 Status
Y (filed 2005-05-06)
Cum Oil (all leases)
8,537 bbl
Cum Gas (all leases)
974,078,417 mcf
Total Permits
925

External Links

Live © 2026 Petrora