42-481-33926

Final Completion

HENRY

WHARTON County · District 3 · ADOBE ENERGY INC. · NEW TAITON (FRIO 4000)

RRC Lookup

Permits

3

Max Depth

5,000 ft

First Permit

1996-10-16

Latest Activity

1998-07-16

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-12-11

Shut-In

Plugged

2002-02-02

!

EWA / Production operator mismatch

Scheduling: ADOBE ENERGY INC. ≠ Production: TRANSTEXAS GAS CORPORATION (reported 2000-01)

Resolved via: schedulingADOBE ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-12

Last Production

2002-02

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#478023 A ADOBE ENERGY, INC.
received 1998-07-16
#453942 A ADOBE ENERGY, INC.
received 1996-11-25
#453942 A ADOBE ENERGY, INC.
received 1996-10-16

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
WHARTON
District
3
Completed
1996-12-11

Operator

Location
THE WOODLAN, DS
P-5 Status
Y (filed 2004-09-03)
Cum Oil (all leases)
503,971 bbl
Cum Gas (all leases)
8,631,775 mcf
Total Permits
144

External Links

Live © 2026 Petrora