42-481-34495

Final Completion

SCHUMAKER ALICE ET AL

WHARTON County · District 3 · FAULCONER VERNON E. INC. · NEW TAITON (MIOCENE 2790)

RRC Lookup

Permits

3

Max Depth

3,200 ft

First Permit

2002-12-17

Latest Activity

2002-12-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2003-01-24

Shut-In

Plugged

2014-07-17

!

EWA / Permit operator mismatch

Scheduling: FAULCONER VERNON E. INC. ≠ Permit: CAMERON ENGINEERING, INC

Resolved via: schedulingFAULCONER VERNON E. INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2003-01

Last Production

2014-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#526220 A CAMERON ENGINEERING, INC
received 2003-02-18
#526220 A CAMERON ENGINEERING, INC
received 2002-12-19
#526220 A CAMERON ENGINEERING, INC
received 2002-12-10

Well Details

Well Number
2
Max Depth
3,200 ft
Drill Type
Vertical
County
WHARTON
District
3
Completed
2003-01-24

Operator

Location
TYLER
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
262,020 bbl
Cum Gas (all leases)
212,479,495 mcf
Activities
CSGD/P, G/PUR, GTHS/G
Total Permits
16

External Links

Live © 2026 Petrora