42-481-34638

Final Completion

DUNCAN DONALD B.

WHARTON County · District 3 · BSE PRODUCTION CO. · SPANISH CAMP W. (3950 FRIO)

RRC Lookup

Permits

1

Max Depth

5,150 ft

First Permit

2004-05-13

Latest Activity

2004-05-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2004-07-16

Shut-In

Plugged

2009-03-12

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2004-07

Last Production

2009-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#544349 A BSE PRODUCTION CO.
received 2004-04-12

Well Details

Well Number
A 9
Max Depth
5,150 ft
Drill Type
Vertical
County
WHARTON
District
3
Completed
2004-07-16

Operator

Location
VICTORIA
P-5 Status
Y (filed 2021-12-10)
Cum Oil (all leases)
289,901 bbl
Cum Gas (all leases)
10,385,370 mcf
Total Permits
38

External Links

Live © 2026 Petrora