42-481-34974

Final Completion

DUNCAN DONALD B.

WHARTON County · District 3 · BSE PRODUCTION CO. · SPANISH CAMP N. (4250)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

2008-04-16

Latest Activity

2008-04-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2008-05-17

Shut-In

Plugged

2019-04-12

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2008-05

Last Production

2019-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#654887 A BSE PRODUCTION CO.
received 2008-02-07

Well Details

Well Number
A 5
Max Depth
5,000 ft
Drill Type
Vertical
County
WHARTON
District
3
Completed
2008-05-17

Operator

Location
VICTORIA
P-5 Status
Y (filed 2021-12-10)
Cum Oil (all leases)
289,901 bbl
Cum Gas (all leases)
10,385,370 mcf
Total Permits
38

External Links

Live © 2026 Petrora