42-481-35109

Final Completion

CARRIERE-HENDERSON G.U.

WHARTON County · District 3 · FAULCONER ENERGY LLC · PORTER S CREEK (YEGUA)

RRC Lookup

Permits

1

Max Depth

8,000 ft

First Permit

2009-11-25

Latest Activity

2009-11-25

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2010-01-18

Shut-In

Plugged

2022-06-08

!

EWA / Production operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Production: RICOCHET ENERGY, INC. (reported 2015-09)

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: RICOCHET ENERGY, INC.

Resolved via: schedulingFAULCONER ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2010-01

Last Production

2022-05

Operator History

originally filed by RICOCHET ENERGY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#687935 A RICOCHET ENERGY, INC.
received 2009-11-24

Well Details

Well Number
1
Max Depth
8,000 ft
Drill Type
Vertical
County
WHARTON
District
3
Completed
2010-01-18

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links