42-483-30677
Final CompletionEVANS
WHEELER County · District 10 · 4P ENERGY TEXAS LLC · BUFFALO WALLOW (MORROW)
Permits
2
Max Depth
15,300 ft
First Permit
1979-09-11
Latest Activity
1983-06-21
Lifespan
4 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-09-15
Shut-In
—
Plugged
2020-03-10
!
EWA / Production operator mismatch
Scheduling: 4P ENERGY TEXAS LLC ≠ Production: LINN OPERATING, INC. (reported 2011-06)
!
EWA / Permit operator mismatch
Scheduling: 4P ENERGY TEXAS LLC ≠ Permit: PIONEER PRODUCTION CORP.
Resolved via: scheduling → 4P ENERGY TEXAS LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2020-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#219231 A PIONEER PRODUCTION CORP.
received 1983-06-17
#57832 A PIONEER PRODUCTION CORP.
received 1979-09-11
Well Details
- Well Number
- 207
- Max Depth
- 15,300 ft
- Drill Type
- Vertical
- County
- WHEELER
- District
- 10
- Operator
- 4P ENERGY TEXAS LLC
- Completed
- 1983-09-15
Operator
- Name
- 4P ENGY TEXAS, LLC
- Location
- DENVER
- P-5 Status
- Y (filed 2020-12-04)
- Cum Oil (all leases)
- 3,085,331 bbl
- Cum Gas (all leases)
- 200,745,379 mcf
- Total Permits
- 127