42-483-30677

Final Completion

EVANS

WHEELER County · District 10 · 4P ENERGY TEXAS LLC · BUFFALO WALLOW (MORROW)

RRC Lookup

Permits

2

Max Depth

15,300 ft

First Permit

1979-09-11

Latest Activity

1983-06-21

Lifespan

4 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-09-15

Shut-In

Plugged

2020-03-10

!

EWA / Production operator mismatch

Scheduling: 4P ENERGY TEXAS LLC ≠ Production: LINN OPERATING, INC. (reported 2011-06)

!

EWA / Permit operator mismatch

Scheduling: 4P ENERGY TEXAS LLC ≠ Permit: PIONEER PRODUCTION CORP.

Resolved via: scheduling4P ENERGY TEXAS LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2020-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#219231 A PIONEER PRODUCTION CORP.
received 1983-06-17
#57832 A PIONEER PRODUCTION CORP.
received 1979-09-11

Well Details

Well Number
207
Max Depth
15,300 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
1983-09-15

Operator

Location
DENVER
P-5 Status
Y (filed 2020-12-04)
Cum Oil (all leases)
3,085,331 bbl
Cum Gas (all leases)
200,745,379 mcf
Total Permits
127

External Links

Live © 2026 Petrora