42-483-30703

Final Completion

HAMMOND

WHEELER County · District 10 · CAMBRIDGE PRODUCTION INC. · WHEELER NW (HUNTON)

RRC Lookup

Permits

2

Max Depth

15,000 ft

First Permit

1979-11-05

Latest Activity

1997-04-16

Lifespan

17 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-03-20

Shut-In

Plugged

1999-04-06

!

EWA / Permit operator mismatch

Scheduling: CAMBRIDGE PRODUCTION INC. ≠ Permit: PARDEE PRODUCTION CO.

Resolved via: schedulingCAMBRIDGE PRODUCTION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1999-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#460663 A PARDEE PRODUCTION CO.
received 1997-04-03
#63018 A MONSANTO COMPANY
received 1979-11-05

Well Details

Well Number
1
Max Depth
15,000 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
1980-03-20

Operator

Location
AMARILLO
P-5 Status
Y (filed 2020-02-07)
Cum Oil (all leases)
207,217 bbl
Cum Gas (all leases)
18,069,848 mcf
Total Permits
60

External Links

Live © 2026 Petrora