42-483-30844

Final Completion

CONWELL GAS UNIT

WHEELER County · District 10 · 4P ENERGY TEXAS LLC · KELTON NW. (MORROW)

RRC Lookup

Permits

2

Max Depth

17,300 ft

First Permit

1981-03-12

Latest Activity

1997-10-03

Lifespan

17 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-10-15

Shut-In

Plugged

2018-05-02

!

EWA / Production operator mismatch

Scheduling: 4P ENERGY TEXAS LLC ≠ Production: CHESAPEAKE OPERATING, INC. (reported 2013-04)

!

EWA / Permit operator mismatch

Scheduling: 4P ENERGY TEXAS LLC ≠ Permit: RIO GRANDE DRILLING COMPANY

Resolved via: scheduling4P ENERGY TEXAS LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2018-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#467914 A RIO GRANDE DRILLING COMPANY
received 1997-09-22
#111922 A EXXON CORP.
received 1981-03-12

Well Details

Well Number
1
Max Depth
17,300 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
1997-10-15

Operator

Location
DENVER
P-5 Status
Y (filed 2020-12-04)
Cum Oil (all leases)
3,085,331 bbl
Cum Gas (all leases)
200,745,379 mcf
Total Permits
127

External Links

Live © 2026 Petrora