42-483-30879
INJECTIONTERRY KATE
WHEELER County · District 10 · OVERFLOW ENERGY LLC · BUFFALO WALLOW (GRANITE WASH)
Permits
2
Max Depth
15,120 ft
First Permit
1981-07-01
Latest Activity
2003-10-21
Lifespan
22 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
2004-03-22
Shut-In
—
Plugged
—
P-5 Org Status: Active
!
EWA / Permit operator mismatch
Scheduling: OVERFLOW ENERGY LLC ≠ Permit: TURNER TRANSPORTATION
Resolved via: scheduling → OVERFLOW ENERGY LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2004-05
Last Production
2026-03
Operator History
originally filed by TURNER TRANSPORTATION — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#537452 A TURNER TRANSPORTATION
received 2003-10-13
#124027 A PIONEER PRODUCTION CORP.
received 1981-07-01
Well Details
- Well Number
- 106
- Max Depth
- 15,120 ft
- Drill Type
- Vertical
- County
- WHEELER
- District
- 10
- Operator
- OVERFLOW ENERGY LLC
- Completed
- 2004-03-22
Operator
- Name
- OVERFLOW ENGY, LLC
- Location
- PERRYTON
- P-5 Status
- Y (filed 2025-08-04)
- Cum Oil (all leases)
- 34,955 bbl
- Cum Gas (all leases)
- 103,712 mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 47