42-483-30921

Final Completion

SHELTON

WHEELER County · District 10 · TECOLOTE ENERGY OPERATING LLC · CANDICE (MORROW)

RRC Lookup

Permits

1

Max Depth

13,000 ft

First Permit

1981-08-28

Latest Activity

1981-08-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-02-26

Shut-In

Plugged

2017-07-26

!

EWA / Production operator mismatch

Scheduling: TECOLOTE ENERGY OPERATING LLC ≠ Production: DEVON ENERGY PRODUCTION CO, L.P. (reported 2015-11)

!

EWA / Permit operator mismatch

Scheduling: TECOLOTE ENERGY OPERATING LLC ≠ Permit: MARSH, TOM F. INC.

Resolved via: schedulingTECOLOTE ENERGY OPERATING LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2017-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#131462 A MARSH, TOM F. INC.
received 1981-08-28

Well Details

Well Number
1-84
Max Depth
13,000 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
1982-02-26

Operator

Location
FORT WORTH
P-5 Status
Y (filed 2021-10-08)
Cum Oil (all leases)
773,960 bbl
Cum Gas (all leases)
125,279,650 mcf
Total Permits
70

External Links

Live © 2026 Petrora