42-483-31068

Final Completion

SHELTON -C-

WHEELER County · District 10 · CONOCOPHILLIPS COMPANY · CANDICE (MORROW)

RRC Lookup

Permits

1

Max Depth

13,100 ft

First Permit

1982-07-27

Latest Activity

1982-07-27

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-12-18

Shut-In

Plugged

2004-08-13

!

EWA / Production operator mismatch

Scheduling: CONOCOPHILLIPS COMPANY ≠ Production: PHILLIPS PETROLEUM COMPANY (reported 2002-03)

!

EWA / Permit operator mismatch

Scheduling: CONOCOPHILLIPS COMPANY ≠ Permit: PHILLIPS PETROLEUM COMPANY

Resolved via: schedulingCONOCOPHILLIPS COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2005-03

Operator History

originally filed by PHILLIPS PETROLEUM COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#167260 A PHILLIPS PETROLEUM COMPANY
received 1982-07-27

Well Details

Well Number
1
Max Depth
13,100 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
1982-12-18

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
81,745,711 bbl
Cum Gas (all leases)
2,770,654,424 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
3,279

External Links

Live © 2026 Petrora