42-483-31091

PRODUCING

FARREN

WHEELER County · District 10 · QUESTA ENERGY CORPORATION · PANHANDLE EAST

RRC Lookup

Permits

1

Max Depth

2,140 ft

First Permit

1982-11-16

Latest Activity

1982-11-16

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1983-01-16

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: QUESTA ENERGY CORPORATION ≠ Permit: RACHALK PRODUCTION, INC.

Resolved via: productionQUESTA ENERGY CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by RACHALK PRODUCTION, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#178153 A RACHALK PRODUCTION, INC.
received 1982-11-16

Well Details

Well Number
1
Max Depth
2,140 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
1983-01-16

Operator

Location
AMARILLO
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
455,214 bbl
Cum Gas (all leases)
19,820,377 mcf
Activities
OPRS/G, OPRS/O
Total Permits
52

External Links

Live © 2026 Petrora