42-483-31265

PRODUCING

KELLER P. M.

WHEELER County · District 10 · MOUNTAINSIDE ENERGY OPERATING L · PANHANDLE WHEELER COUNTY FIELD

RRC Lookup

Permits

1

Max Depth

2,718 ft

First Permit

1985-11-12

Latest Activity

1985-11-12

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1986-01-05

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: MOUNTAINSIDE ENERGY OPERATING L ≠ Production: HIGHMARK ENERGY OPERATING, LLC (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: MOUNTAINSIDE ENERGY OPERATING L ≠ Permit: TEXACO INC.

Resolved via: productionHIGHMARK ENERGY OPERATING, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#289661 A TEXACO INC.
received 1985-09-12

Well Details

Well Number
21
Max Depth
2,718 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
1986-01-05

Operator

Location
DALLAS
P-5 Status
Y (filed 2026-01-21)
Activities
OPRS/G, OPRS/O

External Links

Live © 2026 Petrora