42-483-31574

Final Completion

ROB

WHEELER County · District 10 · MAKAR PRODUCTION COMPANY · MO-TEX (MEISNER)

RRC Lookup

Permits

1

Max Depth

13,200 ft

First Permit

1999-06-17

Latest Activity

1999-06-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1999-09-06

Shut-In

Plugged

2022-04-01

!

EWA / Production operator mismatch

Scheduling: MAKAR PRODUCTION COMPANY ≠ Production: WINDSOR ENERGY GROUP, L.L.C. (reported 2007-12)

!

EWA / Permit operator mismatch

Scheduling: MAKAR PRODUCTION COMPANY ≠ Permit: CAMBRIDGE PRODUCTION, INC.

Resolved via: schedulingMAKAR PRODUCTION COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1999-09

Last Production

2022-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#485224 A CAMBRIDGE PRODUCTION, INC.
received 1999-06-15

Well Details

Well Number
2
Max Depth
13,200 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
1999-09-06

Operator

Location
GRAHAM
P-5 Status
Y (filed 2026-03-04)
Cum Oil (all leases)
58,771 bbl
Cum Gas (all leases)
7,375,010 mcf
Activities
OPRS/G, OPRS/O
Total Permits
1

External Links

Live © 2026 Petrora