42-483-32574

Final Completion

HUNTER A 34

WHEELER County · District 10 · 4P ENERGY TEXAS LLC · BUFFALO WALLOW (GRANITE WASH)

RRC Lookup

Permits

2

Max Depth

14,700 ft

First Permit

2008-02-22

Latest Activity

2011-10-04

Lifespan

4 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2008-06-19

Shut-In

Plugged

2020-02-14

!

EWA / Production operator mismatch

Scheduling: 4P ENERGY TEXAS LLC ≠ Production: ENERVEST OPERATING, L.L.C. (reported 2018-01)

!

EWA / Permit operator mismatch

Scheduling: 4P ENERGY TEXAS LLC ≠ Permit: LINN OPERATING, INC.

Resolved via: scheduling4P ENERGY TEXAS LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2008-05

Last Production

2020-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#725032 A LINN OPERATING, INC.
received 2011-09-27
#655284 A LINN OPERATING, INC.
received 2008-02-13

Well Details

Well Number
9
Max Depth
14,700 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
2008-06-19

Operator

Location
DENVER
P-5 Status
Y (filed 2020-12-04)
Cum Oil (all leases)
3,085,331 bbl
Cum Gas (all leases)
200,745,379 mcf
Total Permits
127

External Links

Live © 2026 Petrora