42-485-43824
Final CompletionPEERY-BRIDWELL
WICHITA County · District 9 · HANACO OPERATING · WICHITA COUNTY REGULAR
Permits
1
Max Depth
2,000 ft
First Permit
2004-01-06
Latest Activity
2004-01-06
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2004-06-02
Shut-In
—
Plugged
2005-08-31
!
EWA / Permit operator mismatch
Scheduling: HANACO OPERATING ≠ Permit: SISSOM OIL
Resolved via: scheduling → HANACO OPERATING
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2005-11
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#540169 A SISSOM OIL
received 2003-12-29
Well Details
- Well Number
- 1S
- Max Depth
- 2,000 ft
- Drill Type
- Vertical
- County
- WICHITA
- District
- 9
- Operator
- HANACO OPERATING
- Completed
- 2004-06-02
Operator
- Name
- HANACO OPER
- Location
- HOLLIDAY
- P-5 Status
- Y (filed 2008-06-06)
- Cum Oil (all leases)
- 124,844 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 20