42-487-31268

Final Completion

WAGGONER -CARO-

WILBARGER County · District 9 · RAJOIL INC. · WILBARGER COUNTY REGULAR

RRC Lookup

Permits

1

Max Depth

2,000 ft

First Permit

1980-06-13

Latest Activity

1980-06-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-12-11

Shut-In

Plugged

1995-12-27

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#83969 A RAJOIL INC.
received 1980-06-13

Well Details

Well Number
4
Max Depth
2,000 ft
Drill Type
Vertical
County
WILBARGER
District
9
Operator
RAJOIL INC.
Completed
1980-12-11

Operator

Location
VERNON
P-5 Status
Y (filed 1996-06-07)
Cum Oil (all leases)
18,925 bbl
Cum Gas (all leases)
— mcf
Total Permits
16

External Links

Live © 2026 Petrora