42-487-33324

Plug Dry Hole (P&A)

PUDGE

WILBARGER County · District 13 · BAKER PROP.-CAMBRON (DYSTON SD)

RRC Lookup

Permits

1

Max Depth

2,000 ft

First Permit

2023-07-25

Latest Activity

2023-07-25

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

2023-08-26

!

EWA / Permit operator mismatch

Scheduling: BURK ROYALTY CO. LTD. ≠ Permit: BURK ROYALTY CO., LTD.

Resolved via: schedulingBURK ROYALTY CO. LTD.

Operator History

originally filed by BURK ROYALTY CO., LTD. — asset transferred

Permit Applications (1)

#892375 A BURK ROYALTY CO., LTD.
received 2023-07-25
Lat 33.968844
Lon -99.002943

Well Details

Well Number
2
Max Depth
2,000 ft
Drill Type
Vertical
County
WILBARGER
District
13
Operator

External Links

Live © 2026 Petrora