42-489-30065

Final Completion

ARMENDAIZ ET AL

WILLACY County · District 4 · PETROTEX MANAGEMENT CO. · ARROYO COLORADO (F-3)

RRC Lookup

Permits

2

Max Depth

4,063 ft

First Permit

1980-06-30

Latest Activity

1992-07-03

Lifespan

12 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1996-01-16

!

EWA / Production operator mismatch

Scheduling: PETROTEX MANAGEMENT CO. ≠ Production: MUELLER ENGINEERING CORP. (reported 1995-10)

!

EWA / Permit operator mismatch

Scheduling: PETROTEX MANAGEMENT CO. ≠ Permit: MUELLER ENGINEERING CORP.

Resolved via: schedulingPETROTEX MANAGEMENT CO.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1996-01

Operator History

originally filed by MUELLER ENGINEERING CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#400721 A MUELLER ENGINEERING CORP.
received 1992-06-30
#85494 A PETROTEX MANAGEMENT CO.
received 1980-06-30

Well Details

Well Number
1
Max Depth
4,063 ft
Drill Type
Vertical
County
WILLACY
District
4

Operator

Location
CORPUS CHRS, TI
P-5 Status
Y (filed 1983-07-15)
Total Permits
44

External Links

Live © 2026 Petrora