Permits
1
Max Depth
600 ft
First Permit
1977-06-15
Latest Activity
1977-06-15
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1978-07-01
Shut-In
—
Plugged
2020-12-03
!
EWA / Permit operator mismatch
Scheduling: SULO OIL COMPANY ≠ Permit: RICHARDSON, JIM
Resolved via: scheduling → SULO OIL COMPANY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by RICHARDSON, JIM — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#745 A RICHARDSON, JIM
received 1977-06-15
Well Details
- Well Number
- 1
- Max Depth
- 600 ft
- Drill Type
- Vertical
- County
- WILSON
- District
- 1
- Operator
- SULO OIL COMPANY
- Completed
- 1978-07-01
Operator
- Name
- SULO OIL CO
- Location
- HOUSTON
- P-5 Status
- Y (filed 2024-08-02)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 54