42-493-31170

Final Completion Horizontal

BOENING A

WILSON County · District 1 · PEDECO INC. · SUTIL (AUSTIN)

RRC Lookup

Permits

3

Max Depth

9,000 ft

First Permit

1982-10-29

Latest Activity

1999-03-11

Lifespan

16 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1998-03-26

Shut-In

Plugged

1999-04-02

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1999-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#483236 A PEDECO, INC.
received 1999-03-11
#472335 A PEDECO, INC.
received 1998-01-20
#175930 A G. A. S. PRODUCTION CO
received 1982-10-29

Well Details

Well Number
1BH
Max Depth
9,000 ft
Drill Type
Horizontal
County
WILSON
District
1
Operator
PEDECO INC.
Completed
1998-03-26

Operator

Location
CASPER
P-5 Status
Y (filed 2005-06-10)
Cum Oil (all leases)
641,487 bbl
Cum Gas (all leases)
2,169,623 mcf
Total Permits
170

External Links

Live © 2026 Petrora