42-493-32475

Plug Dry Hole (P&A)

KOTARA ET AL

WILSON County · District 1 · WILDCAT

RRC Lookup

Permits

1

Max Depth

2,200 ft

First Permit

1997-11-12

Latest Activity

1997-11-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1997-11-21

!

EWA / Permit operator mismatch

Scheduling: CIMARRON ENGINEERING CORP. ≠ Permit: CIMARRON ENGINEERING CORP.

Resolved via: schedulingCIMARRON ENGINEERING CORP.

Operator History

originally filed by CIMARRON ENGINEERING CORP. — asset transferred

Permit Applications (1)

#469949 A CIMARRON ENGINEERING CORP.
received 1997-11-12

Well Details

Well Number
3
Max Depth
2,200 ft
Drill Type
Vertical
County
WILSON
District
1
Operator

External Links

Live © 2026 Petrora