42-493-32970

Final Completion

G.B. DYLLA

WILSON County · District 1 · BASTROP ENERGY GROUP · COOKSEY

RRC Lookup

Permits

1

Max Depth

2,300 ft

First Permit

2023-03-08

Latest Activity

2023-03-08

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2023-04-03

Shut-In

Plugged

2024-08-28

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2023-04

Last Production

2024-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#888728 A BASTROP ENERGY GROUP
received 2023-03-02
Lat 29.304582
Lon -98.227373

Well Details

Well Number
2
Max Depth
2,300 ft
Drill Type
Vertical
County
WILSON
District
1
Completed
2023-04-03

Operator

Location
SAN ANTONIO
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
128,623 bbl
Cum Gas (all leases)
3,833 mcf
Activities
OPRS/O
Total Permits
24

External Links

Live © 2026 Petrora