42-495-03878

Final Completion

HILL M. J. ACCT. 1

WINKLER County · District 8 · XTO ENERGY INC. · HALLEY (PENN. 8000)

RRC Lookup

Permits

2

Max Depth

10,489 ft

First Permit

1999-09-13

Latest Activity

2019-01-15

Lifespan

19 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2000-01-25

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: XTO ENERGY INC. ≠ Production: HILCORP ENERGY COMPANY (reported 2025-07)

Resolved via: schedulingXTO ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#848613 A XTO ENERGY INC.
received 2019-01-11
#487205 A BASS ENTERPRISES PRODUCTION CO.
received 1999-09-02
Lat 31.726666
Lon -102.989902

Well Details

Well Number
7
Max Depth
10,489 ft
Drill Type
Vertical
County
WINKLER
District
8
Completed
2000-01-25

Operator

Location
SPRING
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
755,132,920 bbl
Cum Gas (all leases)
11,012,998,973 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
16,136

External Links

Live © 2026 Petrora