Permits
1
Max Depth
3,600 ft
First Permit
2010-11-30
Latest Activity
2010-11-30
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2018-12-19
Shut-In
—
Plugged
—
P-5 Org Status: Active
!
EWA / Permit operator mismatch
Scheduling: KERMIT SWD INC. ≠ Permit: CUSTER & WRIGHT OPERATING, INC.
Resolved via: scheduling → KERMIT SWD INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2019-05
Last Production
2026-03
Operator History
originally filed by CUSTER & WRIGHT OPERATING, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#706000 A CUSTER & WRIGHT OPERATING, INC.
received 2010-11-29
Well Details
- Well Number
- 2
- Max Depth
- 3,600 ft
- Drill Type
- Vertical
- County
- WINKLER
- District
- 8
- Operator
- KERMIT SWD INC.
- Completed
- 2018-12-19
Operator
- Name
- KERMIT SWD, INC.
- Location
- KERMIT
- P-5 Status
- Y (filed 2025-06-04)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/O