42-495-33554

Final Completion Horizontal

MJ HILL ESTATE

WINKLER County · District 8 · XTO ENERGY INC. · HALLEY (SAN ANDRES)

RRC Lookup

Permits

1

Max Depth

4,555 ft

First Permit

2014-03-26

Latest Activity

2014-03-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2014-06-26

Shut-In

Plugged

2023-01-04

!

EWA / Production operator mismatch

Scheduling: XTO ENERGY INC. ≠ Production: BOPCO, L.P. (reported 2017-05)

!

EWA / Permit operator mismatch

Scheduling: XTO ENERGY INC. ≠ Permit: BOPCO, L.P.

Resolved via: schedulingXTO ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2014-06

Last Production

2023-06

Operator History

originally filed by BOPCO, L.P. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#781454 A BOPCO, L.P.
received 2014-03-06

Well Details

Well Number
1H
Max Depth
4,555 ft
Drill Type
Horizontal
County
WINKLER
District
8
Completed
2014-06-26

Operator

Location
SPRING
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
755,132,920 bbl
Cum Gas (all leases)
11,012,998,973 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
16,136

External Links

Live © 2026 Petrora