42-497-31644

Final Completion

ALTA SEATON

WISE County · District 9 · SMITH PIPE OF ABILENE · PARK SPRINGS (CONGL.)

RRC Lookup

Permits

1

Max Depth

6,100 ft

First Permit

1979-10-12

Latest Activity

1979-10-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-01-26

Shut-In

Plugged

1993-10-01

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SEELY OIL CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1993-09

Operator History

originally filed by SEELY OIL CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#60475 A SEELY OIL CO.
received 1979-10-12

Well Details

Well Number
1
Max Depth
6,100 ft
Drill Type
Vertical
County
WISE
District
9
Completed
1980-01-26

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora