42-497-32447
Final CompletionLITTLE M. C.
WISE County · District 9 · SMITH PIPE OF ABILENE · MONTEATH (CADDO)
Permits
1
Max Depth
6,500 ft
First Permit
1982-07-30
Latest Activity
1982-07-30
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-09-30
Shut-In
—
Plugged
2004-07-09
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: KNIGHT, REUBEN B. (reported 2000-09)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TEXAL PETROLEUM, INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2004-07
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#168184 A TEXAL PETROLEUM, INC.
received 1982-07-30
Well Details
- Well Number
- 1A
- Max Depth
- 6,500 ft
- Drill Type
- Vertical
- County
- WISE
- District
- 9
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1982-09-30
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf