42-497-33674

Final Completion Directional

T. C. W. B. UNIT NO. 6 WB

WISE County · District 9 · REPUBLIC ENERGY INC. · CAP YATES (CONSOLIDATED CONGL.)

RRC Lookup

Permits

2

Max Depth

6,200 ft

First Permit

1991-10-03

Latest Activity

1991-10-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1992-01-07

Shut-In

Plugged

2022-01-18

!

EWA / Production operator mismatch

Scheduling: REPUBLIC ENERGY INC. ≠ Production: FELDERHOFF PRODUCTION COMPANY (reported 2020-10)

!

EWA / Permit operator mismatch

Scheduling: REPUBLIC ENERGY INC. ≠ Permit: WAGGONER-BALDRIDGE OPER. CO, INC

Resolved via: schedulingREPUBLIC ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2022-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#391986 A WAGGONER-BALDRIDGE OPER. CO, INC
received 1991-11-08
#391986 A WAGGONER-BALDRIDGE OPER. CO, INC
received 1991-09-17

Well Details

Well Number
4
Max Depth
6,200 ft
Drill Type
Directional
County
WISE
District
9
Completed
1992-01-07

Operator

Location
DECATUR
P-5 Status
Y (filed 2017-01-06)
Cum Oil (all leases)
451,561 bbl
Cum Gas (all leases)
55,296,618 mcf
Total Permits
238

External Links

Live © 2026 Petrora