42-497-35701
Final CompletionWILSON GAYLEN
WISE County · District 9 · ARUBA PETROLEUM INC. · NEWARK EAST (BARNETT SHALE)
Permits
1
Max Depth
9,000 ft
First Permit
2004-10-05
Latest Activity
2004-10-05
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2005-02-01
Shut-In
—
Plugged
2014-02-17
!
EWA / Production operator mismatch
Scheduling: ARUBA PETROLEUM INC. ≠ Production: 375 ENERGY, INC. (reported 2011-12)
Resolved via: scheduling → ARUBA PETROLEUM INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2005-02
Last Production
2014-07
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#551924 A ARUBA PETROLEUM, INC.
received 2004-10-05
Well Details
- Well Number
- 1
- Max Depth
- 9,000 ft
- Drill Type
- Vertical
- County
- WISE
- District
- 9
- Operator
- ARUBA PETROLEUM INC.
- Completed
- 2005-02-01
Operator
- Name
- ARUBA PETRO, INC
- Location
- DALLAS
- P-5 Status
- Y (filed 2022-07-08)
- Cum Oil (all leases)
- 589,580 bbl
- Cum Gas (all leases)
- 70,629,444 mcf
- Total Permits
- 427