42-499-30998
Final CompletionJOHNSON J.F. EST. UNIT #2
WOOD County · District 6 · FAIR OIL LTD. · B-J (GLOYD)
Permits
1
Max Depth
9,000 ft
First Permit
1981-08-14
Latest Activity
1981-08-14
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-03-01
Shut-In
—
Plugged
2010-12-16
!
EWA / Permit operator mismatch
Scheduling: FAIR OIL LTD. ≠ Permit: FAIR OIL COMPANY
Resolved via: scheduling → FAIR OIL LTD.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2020-12
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#132359 A FAIR OIL COMPANY
received 1981-08-14
Well Details
- Well Number
- 3
- Max Depth
- 9,000 ft
- Drill Type
- Vertical
- County
- WOOD
- District
- 6
- Operator
- FAIR OIL LTD.
- Completed
- 1982-03-01
Operator
- Name
- FAIR OIL, LTD
- Location
- TYLER
- P-5 Status
- Y (filed 2025-08-04)
- Cum Oil (all leases)
- 1,812,382 bbl
- Cum Gas (all leases)
- 21,222,672 mcf
- Activities
- G/PUR, OPRS/G, OPRS/O
- Total Permits
- 88