42-501-32451

PRODUCING

GREEN

YOAKUM County · District 8 · RING ENERGY INC. · CLAIRE-ALAFAIR (SAN ANDRES)

RRC Lookup

Permits

2

Max Depth

9,500 ft

First Permit

1983-09-27

Latest Activity

1987-04-30

Lifespan

4 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

1987-03-08

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Production operator mismatch

Scheduling: RING ENERGY INC. ≠ Production: BUSTAMANTE RESOURCES LLC (reported 2025-07)

!

EWA / Permit operator mismatch

Scheduling: RING ENERGY INC. ≠ Permit: PETRO VEST, INC.

Resolved via: schedulingRING ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#329506 A PETRO VEST, INC.
received 1987-04-27
#215111 A PETRO VEST, INC.
received 1984-05-29
#215111 A PETRO VEST, INC.
received 1983-08-31

Well Details

Well Number
4
Max Depth
9,500 ft
Drill Type
Vertical
County
YOAKUM
District
8
Completed
1987-03-08

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
41,782,424 bbl
Cum Gas (all leases)
407,870 mcf
Activities
GTHS/O, OPRS/G, OPRS/O
Total Permits
961

External Links

Live © 2026 Petrora