42-501-36843

INJECTION

WISHBONE FLATS 400

YOAKUM County · District 8 · RING ENERGY INC. · BLOCK D (DEVONIAN)

RRC Lookup

Permits

4

Max Depth

14,000 ft

First Permit

2017-08-14

Latest Activity

2022-06-21

Lifespan

5 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2023-11-15

Shut-In

Plugged

P-5 Org Status: X

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2018-03

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#880819 A RING ENERGY, INC.
received 2022-10-10
#880819 A RING ENERGY, INC.
received 2022-06-03
#829634 A RING ENERGY, INC.
received 2019-06-05
#829634 A WISHBONE TEXAS OPERATING CO LLC
received 2017-08-07
Lat 33.210035
Lon -102.996137

Well Details

Well Number
1W
Max Depth
14,000 ft
Drill Type
Vertical
County
YOAKUM
District
8
Completed
2023-11-15

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
41,782,424 bbl
Cum Gas (all leases)
407,870 mcf
Activities
GTHS/O, OPRS/G, OPRS/O
Total Permits
961

External Links

Live © 2026 Petrora