42-501-37003

PRODUCING Horizontal

WISHBONE FARMS 710 A

YOAKUM County · District 8 · RING ENERGY INC. · PLATANG (SAN ANDRES)

RRC Lookup

Permits

1

Max Depth

9,000 ft

First Permit

2018-05-04

Latest Activity

2018-05-04

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2018-08-14

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: RING ENERGY INC. ≠ Permit: WISHBONE TEXAS OPERATING CO LLC

Resolved via: productionRING ENERGY, INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2018-08

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#839503 A WISHBONE TEXAS OPERATING CO LLC
received 2018-05-01
Lat 33.051307
Lon -103.006741

Well Details

Well Number
1H
Max Depth
9,000 ft
Drill Type
Horizontal
County
YOAKUM
District
8
Completed
2018-08-14

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
41,782,424 bbl
Cum Gas (all leases)
407,870 mcf
Activities
GTHS/O, OPRS/G, OPRS/O
Total Permits
961

External Links

Live © 2026 Petrora