42-503-33256

Final Completion

CHOATE

YOUNG County · District 9 · SMITH PIPE OF ABILENE · SALT FORK (MCLESTER)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

1979-05-22

Latest Activity

1979-05-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-09-30

Shut-In

Plugged

2004-09-22

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: NITSCHKE, DAN E. (reported 1993-08)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: NITSCHKE, DAN E.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2004-09

Operator History

originally filed by NITSCHKE, DAN E. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#49315 A NITSCHKE, DAN E.
received 1979-05-22

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
YOUNG
District
9
Completed
1980-09-30

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora