42-503-38365

Final Completion

ALLAR

YOUNG County · District 9 · JAID ENERGY LLC · BARBEE (ATOKA)

RRC Lookup

Permits

1

Max Depth

4,999 ft

First Permit

1984-09-13

Latest Activity

1984-09-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-10-03

Shut-In

Plugged

2021-10-22

!

EWA / Permit operator mismatch

Scheduling: JAID ENERGY LLC ≠ Permit: HAWKINS, G. A.

Resolved via: schedulingJAID ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2022-01

Operator History

originally filed by HAWKINS, G. A. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#251336 A HAWKINS, G. A.
received 1984-09-13

Well Details

Well Number
3
Max Depth
4,999 ft
Drill Type
Vertical
County
YOUNG
District
9
Completed
1984-10-03

Operator

Location
GRAHAM
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
30,441 bbl
Cum Gas (all leases)
88,459 mcf
Total Permits
6

External Links

Live © 2026 Petrora