42-503-38611
Final CompletionCHOATE
YOUNG County · District 9 · SMITH PIPE OF ABILENE · SALT FORK (MCLESTER)
Permits
1
Max Depth
4,500 ft
First Permit
1985-02-11
Latest Activity
1985-02-11
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-03-01
Shut-In
—
Plugged
2004-09-14
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: SIROCO OPERATING CO., INC. (reported 2003-02)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: AYRES OIL, INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2012-10
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#266536 A AYRES OIL, INC.
received 1985-02-11
Well Details
- Well Number
- 5
- Max Depth
- 4,500 ft
- Drill Type
- Vertical
- County
- YOUNG
- District
- 9
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1985-03-01
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf