42-503-40245

Final Completion

TUFFLI-CLAYTON

YOUNG County · District 9 · KRAMER FRANK C. · BRAZEEL (CADDO)

RRC Lookup

Permits

1

Max Depth

4,999 ft

First Permit

1990-11-12

Latest Activity

1990-11-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-11-01

Shut-In

Plugged

1991-10-03

!

EWA / Permit operator mismatch

Scheduling: KRAMER FRANK C. ≠ Permit: KARPER COMPANY, THE

Resolved via: schedulingKRAMER FRANK C.

Operator History

originally filed by KARPER COMPANY, THE — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#379520 A KARPER COMPANY, THE
received 1990-10-15

Well Details

Well Number
4
Max Depth
4,999 ft
Drill Type
Vertical
County
YOUNG
District
9
Completed
1990-11-01

Operator

Location
GRAHAM
P-5 Status
Y (filed 2004-04-02)
Cum Oil (all leases)
252,161 bbl
Cum Gas (all leases)
1,452,079 mcf
Total Permits
71

External Links

Live © 2026 Petrora