42-505-30287

Final Completion

CUELLAR HESIGUIO

ZAPATA County · District 4 · ENERGY 2000 INC. · UREBENO SOUTH (WILCOX 7000)

RRC Lookup

Permits

1

Max Depth

7,030 ft

First Permit

2004-04-27

Latest Activity

2004-04-27

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2003-02-28

Shut-In

Plugged

2013-01-22

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2013-01

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#543006 A ENERGY 2000, INC.
received 2004-03-09

Well Details

Well Number
1
Max Depth
7,030 ft
Drill Type
Vertical
County
ZAPATA
District
4
Completed
2003-02-28

Operator

Location
RENO
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
90,827 bbl
Cum Gas (all leases)
656,934 mcf
Activities
GTHS/O, OPRS/G
Total Permits
3

External Links

Live © 2026 Petrora