42-505-31394

Final Completion

LOPENO A

ZAPATA County · District 4 · XTO ENERGY INC. · LOPENO (450)

RRC Lookup

Permits

1

Max Depth

700 ft

First Permit

1981-07-13

Latest Activity

1981-07-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-07-21

Shut-In

Plugged

2013-01-09

!

EWA / Permit operator mismatch

Scheduling: XTO ENERGY INC. ≠ Permit: TEXAS OIL & GAS CORP.

Resolved via: schedulingXTO ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2013-01

Operator History

originally filed by TEXAS OIL & GAS CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#125740 A TEXAS OIL & GAS CORP.
received 1981-07-13

Well Details

Well Number
38
Max Depth
700 ft
Drill Type
Vertical
County
ZAPATA
District
4
Completed
1981-07-21

Operator

Location
SPRING
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
755,132,920 bbl
Cum Gas (all leases)
11,012,998,973 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
16,136

External Links

Live © 2026 Petrora