42-505-32527
Final CompletionGUTIERREZ
ZAPATA County · District 4 · KILLAM OIL CO. LTD. · EL HUERFANO (10800)
Permits
1
Max Depth
15,000 ft
First Permit
1989-02-09
Latest Activity
1989-02-09
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1989-03-29
Shut-In
—
Plugged
1998-12-08
!
EWA / Permit operator mismatch
Scheduling: KILLAM OIL CO. LTD. ≠ Permit: KILLAM OIL COMPANY
Resolved via: scheduling → KILLAM OIL CO. LTD.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1998-12
Operator History
originally filed by KILLAM OIL COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#355883 A KILLAM OIL COMPANY
received 1989-02-08
Well Details
- Well Number
- 3
- Max Depth
- 15,000 ft
- Drill Type
- Vertical
- County
- ZAPATA
- District
- 4
- Operator
- KILLAM OIL CO. LTD.
- Completed
- 1989-03-29
Operator
- Name
- KILLAM OIL CO., LTD
- Location
- LAREDO
- P-5 Status
- Y (filed 2026-02-04)
- Cum Oil (all leases)
- 8,566,146 bbl
- Cum Gas (all leases)
- 552,173,615 mcf
- Activities
- CSGD/P, G/PUR, OPRS/G, OPRS/O
- Total Permits
- 829