42-507-31108

Final Completion

VAN CLEVE C.

ZAVALA County · District 1 · TEXOKAN OPERATING INC. · PILOSA EAST (2ND SAN MIGUEL)

RRC Lookup

Permits

1

Max Depth

3,000 ft

First Permit

1979-03-13

Latest Activity

1979-03-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-04-06

Shut-In

Plugged

2013-12-03

!

EWA / Production operator mismatch

Scheduling: TEXOKAN OPERATING INC. ≠ Production: BOTASCH OPERATING, LLC (reported 2008-05)

!

EWA / Permit operator mismatch

Scheduling: TEXOKAN OPERATING INC. ≠ Permit: BURK ROYALTY COMPANY

Resolved via: schedulingTEXOKAN OPERATING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#44211 A BURK ROYALTY COMPANY
received 1979-03-13

Well Details

Well Number
2
Max Depth
3,000 ft
Drill Type
Vertical
County
ZAVALA
District
1
Completed
1979-04-06

Operator

Location
DALLAS
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
46,353 bbl
Cum Gas (all leases)
15,846 mcf
Activities
OPRS/G, OPRS/O
Total Permits
9

External Links

Live © 2026 Petrora