42-507-31244

Final Completion

VAN CLEVE JACK B

ZAVALA County · District 1 · HAMPTON ENERGY CORPORATION · PILOSA EAST (2ND SAN MIGUEL)

RRC Lookup

Permits

1

Max Depth

3,000 ft

First Permit

1979-10-12

Latest Activity

1979-10-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-10-25

Shut-In

Plugged

2018-12-11

!

EWA / Permit operator mismatch

Scheduling: HAMPTON ENERGY CORPORATION ≠ Permit: BURK ROYALTY COMPANY

Resolved via: schedulingHAMPTON ENERGY CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by BURK ROYALTY COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#60325 A BURK ROYALTY COMPANY
received 1979-10-12

Well Details

Well Number
3
Max Depth
3,000 ft
Drill Type
Vertical
County
ZAVALA
District
1
Completed
1979-10-25

Operator

Location
SAN ANTONIO
P-5 Status
Y (filed 2018-05-04)
Cum Oil (all leases)
574 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora