42-605-30155
Plug Dry Hole (P&A)STATE TRACT 163-S
GALVESTON-SB County · District 3 · WILDCAT
Permits
1
Max Depth
9,000 ft
First Permit
1989-06-08
Latest Activity
1989-06-08
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1989-06-25
!
EWA / Permit operator mismatch
Scheduling: PELTO OIL COMPANY ≠ Permit: PELTO OIL COMPANY
Resolved via: scheduling → PELTO OIL COMPANY
Operator History
originally filed by PELTO OIL COMPANY — asset transferred
Permit History (1)
Permit Applications (1)
#360223 A PELTO OIL COMPANY
received 1989-06-08
Well Details
- Well Number
- 1
- Max Depth
- 9,000 ft
- Drill Type
- Vertical
- County
- GALVESTON-SB
- District
- 3
- Operator
- —